Skip to content
Crysbol (Pty) Ltd
Borehole yield test under way: tripod over the borehole, test rig trailer and water discharging

Service · Yield testing

Borehole yield testing & certificates in South Africa

Pumping tests with our in-house test rig to SANS 10299-4:2003, and a borehole yield certificate when each test is complete.

What is a borehole yield test?

A borehole yield test determines the maximum amount of water that can be pumped from a borehole and how much water flows back into it from the surrounding groundwater source. The results give a safe pumping rate, pump installation depth and pumping schedule, recorded on a borehole yield certificate.

Crysbol Consulting tests boreholes with its own in-house test rig, in accordance with SANS 10299-4:2003, the South African National Standard for test pumping of water boreholes. We are registered with the Borehole Water Association of Southern Africa and issue a borehole yield certificate when each test is complete.

A standard test runs three to four step-drawdown tests at increasing pumping rates, each lasting 60 minutes, then a 24-hour constant discharge test, with water level recovery measured after each test. A groundwater sample taken during the constant-rate test is analysed for microbiology and inorganic and organic chemistry, to check that the water suits drinking and domestic use.

Last updated

When you need it

When do you need yield testing work?

  • You have a new borehole and need to size the pump correctly
  • A bank, buyer or municipality asks for a borehole certificate
  • You plan to supply irrigation, a school, a clinic or an estate from the borehole
  • An existing borehole's yield has dropped or it pumps dry

How it works

Our process, step by step

  1. 01

    Checks and calibration

    We measure the depth, rest water level and condition of the borehole, then run a short calibration test to set the pumping rates.

  2. 02

    Step-drawdown tests

    Three to four steps at increasing pumping rates, each lasting 60 minutes, show how the water level responds to demand.

  3. 03

    Constant discharge test

    Pumping at a steady rate for 24 hours shows how the borehole and aquifer behave over time. A groundwater sample is taken during this test.

  4. 04

    Recovery measurements

    After each test, we record how quickly the water level recovers once pumping stops.

  5. 05

    Analysis and certificate

    We analyse the data and issue a borehole yield certificate with the sustainable yield, pump depth and pumping schedule, together with the water quality results.

What the work covers

  • 01Step-drawdown, constant-rate and recovery testing
  • 02Water quality sampling and analysis
  • 03Sustainable yield analysis
  • 04Pump depth and schedule recommendations
  • 05Borehole rehabilitation assessments

Standards and references

SANS 10299-4:2003
The South African National Standard for test pumping of water boreholes, which our tests follow.
SANS 241
Drinking water quality: microbiological, inorganic and organic chemistry results are compared with it.
Borehole Water Association of Southern Africa
Crysbol is registered with the association.
National Water Act (Act 36 of 1998)
Registration and authorisation of groundwater use.

In the field

Our yield testing work on site

  • Crysbol borehole test rig and vehicle set up on a borehole
    Crysbol borehole test rig and vehicle set up on a borehole
  • Tripod and test rig over a borehole with a Crysbol vehicle
    Tripod and test rig over a borehole with a Crysbol vehicle
  • Crew running a pumping test at the tripod
    Crew running a pumping test at the tripod
  • Test rig trailer with a technician in high-visibility clothing
    Test rig trailer with a technician in high-visibility clothing
  • Test rig set up beside a school building
    Test rig set up beside a school building
  • Crysbol vehicle and test trailer beside a building
    Crysbol vehicle and test trailer beside a building
  • Crysbol vehicle and test rig trailer in the bushveld
    Crysbol vehicle and test rig trailer in the bushveld

Recent projects

Borehole yield testing & certificates: recent work

All projects
  • Borehole yield testing at 15 schools in the Greater Letaba municipality

    Greater Letaba Local Municipality, Mopani District, Limpopo · August 2026

    Borehole yield testing at 15 schools in the Greater Letaba municipality

    Yield testing and groundwater assessment of existing supply boreholes at 15 schools, with step-drawdown, constant-discharge and recovery tests and aquifer analysis to determine sustainable yields.

  • Borehole yield testing for Platfontein Lodge and Conference Centre

    Kimberley, Northern Cape · June 2026

    Borehole yield testing for Platfontein Lodge and Conference Centre

    A step-drawdown, 24-hour constant-discharge and recovery test, with groundwater quality analysis, to set the borehole's sustainable yield and management requirements.

  • 24-hour borehole yield test at Tjhidelani Primary School

    Thembisile Hani Local Municipality, Mpumalanga · June 2026

    24-hour borehole yield test at Tjhidelani Primary School

    A 24-hour borehole yield test at Tjhidelani Primary School, with step-drawdown, constant-rate and recovery testing.

  • 24-hour borehole yield test at Tshikambe Primary School

    Vhembe district, Limpopo · March 2026

    24-hour borehole yield test at Tshikambe Primary School

    A 24-hour borehole yield test at Tshikambe Primary School to confirm a sustainable supply for the school.

  • Borehole yield test at Sedibeng TVET College

    Heidelberg, Gauteng · February 2026

    Borehole yield test at Sedibeng TVET College

    Testing of an existing borehole to determine its performance and suitability as a long-term supply: desktop assessment, step-drawdown, constant-discharge and recovery tests, sampling, water quality analysis and management recommendations.

  • 24-hour borehole yield test at Moshongo Village

    Capricorn district, Limpopo · February 2026

    24-hour borehole yield test at Moshongo Village

    A 24-hour borehole yield test for the community water supply at Moshongo Village.

Questions

Borehole yield testing & certificates: frequently asked questions

How long does a borehole yield test take?

A standard test includes three to four 60-minute step-drawdown tests and a 24-hour constant discharge test, with recovery measured after each, so the field work usually runs over two days.

What does a borehole certificate show?

It records the borehole's depth and construction, the test results, the recommended sustainable yield, the depth to install the pump and a daily pumping schedule. If we sample the water, results against SANS 241 are included.

Is my borehole water safe to drink?

Only a laboratory test can tell. We sample the water and have it analysed against SANS 241, which covers microbiological, chemical and physical parameters, and we explain the results and any treatment needed.

Why has my borehole yield dropped?

Common causes are over-pumping, falling regional water levels during drought, clogged screens or fractures, and pump problems. A new yield test and inspection shows which applies and whether rehabilitation can help.

Do you test boreholes outside Gauteng?

Yes. We test boreholes across South Africa and plan trips to cover several boreholes in an area to keep travel costs down.

Need yield testing support?

Send us the site location and a short description of the work. We will reply with a scope and quote, usually within two working days.