Skip to content
Crysbol (Pty) Ltd
Borehole yield test under way: tripod over the borehole, test rig trailer and water discharging

Limpopo · Maruleng Local Municipality

Borehole yield testing in Hoedspruit

Yield testing and certificates for lodges, estates and farms that need backup to the Blyde supply.

Working in Hoedspruit

Yield testing for sites in and around Hoedspruit

One of our most requested services in Hoedspruit

Crysbol Consulting provides professional geotechnical investigations, geophysical surveys, groundwater exploration and drilling services in Hoedspruit and surrounding areas. Our experienced technical teams are equipped to undertake projects of varying sizes, delivering reliable site investigations and practical solutions tailored to each client's requirements.

Hoedspruit lies in the Lowveld below the Drakensberg escarpment, in the Maruleng municipality. Air Force Base Hoedspruit, private reserves such as Klaserie and Timbavati, and citrus and mango farms shape the local economy.

From Hoedspruit we also cover Klaserie.

Ground conditions in Hoedspruit

  1. Below the escarpment

    Archaean granite and gneiss underlie the plains, while the escarpment to the west is formed by Transvaal Supergroup quartzite and dolomite. Borehole yields on the plains depend on fracture zones and weathering depth.

  2. Reserves and seasonal rivers

    Lodges, water points and boreholes in the reserves sit close to seasonal rivers and wildlife areas, so most new water uses need authorisation.

When you need it

When you need yield testing in Hoedspruit

  • You have a new borehole and need to size the pump correctly
  • A bank, buyer or municipality asks for a borehole certificate
  • You plan to supply irrigation, a school, a clinic or an estate from the borehole
  • An existing borehole's yield has dropped or it pumps dry

How it works

Our process, step by step

  1. 01

    Checks and calibration

    We measure the depth, rest water level and condition of the borehole, then run a short calibration test to set the pumping rates.

  2. 02

    Step-drawdown tests

    Three to four steps at increasing pumping rates, each lasting 60 minutes, show how the water level responds to demand.

  3. 03

    Constant discharge test

    Pumping at a steady rate for 24 hours shows how the borehole and aquifer behave over time. A groundwater sample is taken during this test.

  4. 04

    Recovery measurements

    After each test, we record how quickly the water level recovers once pumping stops.

  5. 05

    Analysis and certificate

    We analyse the data and issue a borehole yield certificate with the sustainable yield, pump depth and pumping schedule, together with the water quality results.

Recent projects

Borehole yield testing in Limpopo: recent work

  • Greater Letaba Local Municipality, Mopani District, Limpopo · August 2026

    Borehole yield testing at 15 schools in the Greater Letaba municipality

    Yield testing and groundwater assessment of existing supply boreholes at 15 schools, with step-drawdown, constant-discharge and recovery tests and aquifer analysis to determine sustainable yields.

  • Vhembe district, Limpopo · March 2026

    24-hour borehole yield test at Tshikambe Primary School

    A 24-hour borehole yield test at Tshikambe Primary School to confirm a sustainable supply for the school.

  • Capricorn district, Limpopo · February 2026

    24-hour borehole yield test at Moshongo Village

    A 24-hour borehole yield test for the community water supply at Moshongo Village.

  • Capricorn district, Limpopo · February 2025

    24-hour borehole yield test at Mantsha Primary School

    A 24-hour borehole yield test at Mantsha Primary School, with water sampled during the constant-rate test.

Questions

Borehole yield testing in Hoedspruit: questions

Do you offer borehole yield testing in Hoedspruit?

Yes. Yield testing and certificates for lodges, estates and farms that need backup to the Blyde supply. Crysbol Consulting provides professional geotechnical investigations, geophysical surveys, groundwater exploration and drilling services in Hoedspruit and surrounding areas. Our experienced technical teams are equipped to undertake projects of varying sizes, delivering reliable site investigations and practical solutions tailored to each client's requirements.

How do I get a quote for yield testing work in Hoedspruit?

Send us the site location and a short description of the work through our quote form, or call 010 102 3591. We usually reply with a scope and a quote within two working days.

How long does a borehole yield test take?

A standard test includes three to four 60-minute step-drawdown tests and a 24-hour constant discharge test, with recovery measured after each, so the field work usually runs over two days.

What does a borehole certificate show?

It records the borehole's depth and construction, the test results, the recommended sustainable yield, the depth to install the pump and a daily pumping schedule. If we sample the water, results against SANS 241 are included.

Need yield testing in Hoedspruit?

Send us the site location and what you need. We plan field work to cover several sites per trip and usually reply with a scope and quote within two working days.