Skip to content
Crysbol (Pty) Ltd
Borehole yield test under way: tripod over the borehole, test rig trailer and water discharging

Northern Cape · Kai !Garib Local Municipality

Borehole yield testing in Kakamas

Yield testing where boreholes are the only reliable water source.

Working in Kakamas

Yield testing for sites in and around Kakamas

Crysbol Consulting provides professional geotechnical investigations, geophysical surveys, groundwater exploration and drilling services in Kakamas and surrounding areas. Our experienced technical teams are equipped to undertake projects of varying sizes, delivering reliable site investigations and practical solutions tailored to each client's requirements.

Kakamas began in the late 1890s as a church-run settlement where families dug irrigation canals from the Orange River by hand. Some of the old water wheels that lift water out of those canals still turn, and table grapes and raisins remain the core of the economy.

From Kakamas we also cover Augrabies and Riemvasmaak.

Ground conditions in Kakamas

  1. Gneiss at shallow depth

    Granite and gneiss of the Namaqua–Natal Metamorphic Province crop out across the district, so trenching and foundations often reach hard rock at shallow depth.

  2. Canal and floodplain soils

    Along the river, alluvial silt and sand with a high water table lie beside the canals, and these soils can be soft and salty in places.

When you need it

When you need yield testing in Kakamas

  • You have a new borehole and need to size the pump correctly
  • A bank, buyer or municipality asks for a borehole certificate
  • You plan to supply irrigation, a school, a clinic or an estate from the borehole
  • An existing borehole's yield has dropped or it pumps dry

How it works

Our process, step by step

  1. 01

    Checks and calibration

    We measure the depth, rest water level and condition of the borehole, then run a short calibration test to set the pumping rates.

  2. 02

    Step-drawdown tests

    Three to four steps at increasing pumping rates, each lasting 60 minutes, show how the water level responds to demand.

  3. 03

    Constant discharge test

    Pumping at a steady rate for 24 hours shows how the borehole and aquifer behave over time. A groundwater sample is taken during this test.

  4. 04

    Recovery measurements

    After each test, we record how quickly the water level recovers once pumping stops.

  5. 05

    Analysis and certificate

    We analyse the data and issue a borehole yield certificate with the sustainable yield, pump depth and pumping schedule, together with the water quality results.

Recent projects

Borehole yield testing in Northern Cape: recent work

  • Kimberley, Northern Cape · June 2026

    Borehole yield testing for Platfontein Lodge and Conference Centre

    A step-drawdown, 24-hour constant-discharge and recovery test, with groundwater quality analysis, to set the borehole's sustainable yield and management requirements.

Questions

Borehole yield testing in Kakamas: questions

Do you offer borehole yield testing in Kakamas?

Yes. Yield testing where boreholes are the only reliable water source. Crysbol Consulting provides professional geotechnical investigations, geophysical surveys, groundwater exploration and drilling services in Kakamas and surrounding areas. Our experienced technical teams are equipped to undertake projects of varying sizes, delivering reliable site investigations and practical solutions tailored to each client's requirements.

How do I get a quote for yield testing work in Kakamas?

Send us the site location and a short description of the work through our quote form, or call 010 102 3591. We usually reply with a scope and a quote within two working days.

How long does a borehole yield test take?

A standard test includes three to four 60-minute step-drawdown tests and a 24-hour constant discharge test, with recovery measured after each, so the field work usually runs over two days.

What does a borehole certificate show?

It records the borehole's depth and construction, the test results, the recommended sustainable yield, the depth to install the pump and a daily pumping schedule. If we sample the water, results against SANS 241 are included.

Need yield testing in Kakamas?

Send us the site location and what you need. We plan field work to cover several sites per trip and usually reply with a scope and quote within two working days.