Skip to content
Crysbol (Pty) Ltd
Borehole yield test under way: tripod over the borehole, test rig trailer and water discharging

Northern Cape · Magareng Local Municipality

Borehole yield testing in Warrenton

Yield testing where boreholes are the only reliable water source.

Working in Warrenton

Yield testing for sites in and around Warrenton

Crysbol Consulting offers professional geotechnical, geological, geophysical and drilling services in Warrenton and surrounding areas. Our experienced teams provide efficient site investigations, technical expertise and reliable project delivery tailored to local project requirements.

Warrenton was laid out in the 1880s to grow vegetables for the diamond fields, and diamonds were found there in 1888 and mined until the 1920s. It is the only town in the Magareng municipality and lies on the N12 north of Kimberley.

Ground conditions in Warrenton

  1. Diamond-bearing terraces

    Old river gravels on terraces along the Vaal host alluvial diamonds, as they do downstream at Windsorton and Barkly West.

  2. Lava and calcrete

    Hard Ventersdorp andesite forms much of the bedrock, overlain in places by Dwyka tillite, calcrete and red sand.

When you need it

When you need yield testing in Warrenton

  • You have a new borehole and need to size the pump correctly
  • A bank, buyer or municipality asks for a borehole certificate
  • You plan to supply irrigation, a school, a clinic or an estate from the borehole
  • An existing borehole's yield has dropped or it pumps dry

How it works

Our process, step by step

  1. 01

    Checks and calibration

    We measure the depth, rest water level and condition of the borehole, then run a short calibration test to set the pumping rates.

  2. 02

    Step-drawdown tests

    Three to four steps at increasing pumping rates, each lasting 60 minutes, show how the water level responds to demand.

  3. 03

    Constant discharge test

    Pumping at a steady rate for 24 hours shows how the borehole and aquifer behave over time. A groundwater sample is taken during this test.

  4. 04

    Recovery measurements

    After each test, we record how quickly the water level recovers once pumping stops.

  5. 05

    Analysis and certificate

    We analyse the data and issue a borehole yield certificate with the sustainable yield, pump depth and pumping schedule, together with the water quality results.

Recent projects

Borehole yield testing in Northern Cape: recent work

  • Kimberley, Northern Cape · June 2026

    Borehole yield testing for Platfontein Lodge and Conference Centre

    A step-drawdown, 24-hour constant-discharge and recovery test, with groundwater quality analysis, to set the borehole's sustainable yield and management requirements.

Questions

Borehole yield testing in Warrenton: questions

Do you offer borehole yield testing in Warrenton?

Yes. Yield testing where boreholes are the only reliable water source. Crysbol Consulting offers professional geotechnical, geological, geophysical and drilling services in Warrenton and surrounding areas. Our experienced teams provide efficient site investigations, technical expertise and reliable project delivery tailored to local project requirements.

How do I get a quote for yield testing work in Warrenton?

Send us the site location and a short description of the work through our quote form, or call 010 102 3591. We usually reply with a scope and a quote within two working days.

How long does a borehole yield test take?

A standard test includes three to four 60-minute step-drawdown tests and a 24-hour constant discharge test, with recovery measured after each, so the field work usually runs over two days.

What does a borehole certificate show?

It records the borehole's depth and construction, the test results, the recommended sustainable yield, the depth to install the pump and a daily pumping schedule. If we sample the water, results against SANS 241 are included.

Need yield testing in Warrenton?

Send us the site location and what you need. We plan field work to cover several sites per trip and usually reply with a scope and quote within two working days.